Artikelrobot
Well-Known Member
With the DXpedition scheduled for around the middle of January 2006, it is the team's objective to be on Peter I for a minimum of two weeks, with the actual operating time to be determined by weather and set-up time
http://www.southgatearc.org/news/jun2005/peter_one.htm
http://www.southgatearc.org/news/jun2005/peter_one.htm